Tskneti
Cantilevered upper floor over a glazed living level
- Area
- 180 m²
- Storeys
- 2
- Bedrooms
- 4
- Bathrooms
- 3
- Build
- 9 months
- Plot from
- 600 m²
From$63,000
Request this design ↗
General contractor in low-rise house building since 2006
Mission
A client comes to us needing to find a plot, design a house, build it, fit the engineering systems, finish it inside and out, and landscape the grounds. We do all of it — a single point of responsibility from the first survey to the handover.
We build in monolith, block, brick and steel. We do not build timber houses.
Our experience in numbers
Projects of every scale and complexity completed and handed over to Clients.
Years of experience in low-rise house building.
Every third Client comes to the Company on a recommendation.
Team
Partners
Chief Architect, head of the design bureau
Head of the landscape studio
Architecture & design
The Company’s design bureau turns a plot into an approved project ready for construction: structure, engineering systems, facades, interiors and landscaping, with a full set of documentation.

House catalogue
Six ready projects, each adapted to the Client’s plot, family and budget.
Interior
Interior
Interior
Interior
Interior
Interior
Cantilevered upper floor over a glazed living level
From$63,000
Request this design ↗Covered carport and a long first-floor balcony
From$73,500
Request this design ↗Double-height entrance and an integrated garage
From$91,000
Request this design ↗Stepped roof terraces and a garden pool
From$112,000
Request this design ↗Three compact storeys for a narrow hillside plot
From$84,000
Request this design ↗Wide garden front with a pool courtyard
From$133,000
Request this design ↗Completed objects
Houses the Company has built and handed over to their owners — from the first visit to the plot to the keys.


/ recent handovers /
How a project runs
Prices
per m², turnkey structure with engineering and finishing scope agreed per project.
per m², individual design including structure and engineering documentation.
Final cost is fixed in the estimate and held through the contract — one of the five commitments above.
Open the page ↗






